Prototype → Low Volume → Mass Production

Engineering Validation EVT DVT PVT

We run and document the validation builds you need to prove form, fit, function and production capability. EVT, DVT and PVT are structured to find issues early, validate fixes, and deliver production‑ready artifacts including FAI/PPAP, control plans and Cpk analysis.

📐 Metrology + CMM  🌡️ Environmental / Reliability Testing
📑 FAI / PPAP / Cpk  📦 Production Handover

Validated Builds • FAI/PPAP • Process Windows

Deliverable

Structured Engineering Validation

Our staged validation process ensures product reliability from prototype to production.
reliability

EVT - Engineering Validation Test

Short, fast builds using prototype and bridge production methods to confirm form, fit, basic function, and to uncover early design issues. Rapid iteration and close engineering feedback are the focus.

design

DVT - Design Validation Test

Production‑intent materials and assemblies undergo full functional testing, environmental stress testing, and tolerance verification. DVT confirms the design against specs and refines the manufacturing approach.

process

PVT - Process Validation Test

Pilot runs off near‑hardened lines to establish process windows, capability (Cpk), FAI/PPAP, packaging validation and final SOP readiness. This stage proves the manufacturing system, not just the design.

Validation Workflow

1

Plan & Protocol

Create build plans, sampling, acceptance criteria, test protocols and metrology checklists before the first build.

2

Build & Inspect

Execute builds, capture CMM data, photos and dimensional reports; log nonconformances and dispositions.

3

Functional & Environmental Testing

Run thermal, vibration, shock, humidity and lifecycle tests aligned to product requirements and regulatory needs.

4

Analysis & Iteration

Analyze failures, perform root‑cause investigation, implement design or process corrective actions and revalidate.

5

Qualification & Handover

Complete FAI/PPAP, Cpk analysis, control plan and supplier instruction sets for SOP release and ongoing monitoring.

From Prototypes to Volume Key Services

We provide end‑to‑end validation services—dimensional checks, reliability testing, functional performance, and process qualification—backed by SPC and capability studies. Typical timelines span from rapid prototypes to full SOP ramp, ensuring quality and readiness at every stage.
Dimensional & Metrology

Dimensional & Metrology

CMM reports, 3D scanning, gauge designs and GR&R studies to validate critical dimensions and interfaces. We correlate inspection results with drawings and CAD to drive corrective actions.
Environmental & Reliability

Environmental & Reliability

Vibration, shock, thermal cycling, humidity, salt fog and thermal soak tests to replicate field conditions and ensure long‑term reliability.
Functional & Performance

Functional & Performance

System‑level functional tests, power cycling, thermal mapping (ΔT vs power vs flow), and operational endurance tests unique to your product class.
FAI _ PPAP & Process Qualification

FAI / PPAP & Process Qualification

We prepare full first article packages, material traceability, inspection reports and process documentation to customer and regulatory standards. PPAP packaging includes control plans, PFMEA and capability evidence.
SPC, Cpk & Process Windows

SPC, Cpk & Process Windows

We conduct capability studies on CTQs, recommend control limits and set up SPC charts and dashboards to monitor run stability through ramp and into SOP.

Activity Timelines & Typical SLAs

Actual times depend on complexity, materials and number of variants. These are representative ranges.
Activity Representative SLA Notes
Rapid proto part 2–7 days Machined, printed or bridge tooling
EVT build 1–3 weeks Small batch, iterative fixes expected
DVT build & testing 2–6 weeks Full functional and environmental testing
PVT / pilot run 2–8 weeks Process windowing, PPAP/FAI and packaging validation
Full SOP ramp varies Based on production volume and tooling
responsibility

Roles & Responsibilities

We can operate as your engineering lead or as an embedded partner with your team. Typical responsibilities: program engineering (YourBrand) manages builds, metrology, testing coordination, NPI PM and FAI deliverables. Your team provides acceptance criteria, final approvals and commercial decisions.

Snapshot

EVT → 2 builds, 10 units each. DVT → 30 units in production intent. PVT → 200 pilot parts, full PPAP and supplier handover.

Case Study Power Electronics Inverter

Problem: early EVT units showed thermal runaway in high ambient conditions. Approach: EVT builds with thermal mapping identified hotspot; CAE correlated with flow imbalance; redesign of cold plate manifold and rebalancing of flow solved issue. DVT confirmed robust performance across environmental tests. PVT established process window and Cpk > 1.67 for critical dimensions. Outcome: SOP achieved with no warranty events in year one.

Prepare Your EVT / DVT / PVT Plan

Upload your CAD, BOM and target validation criteria. We’ll return a proposed validation plan, sample counts, test protocols and a staged schedule within 48 business hours.
We make it fast, easy, and risk-free to get started.
Get Free Quote in 30 Minutes

All uploads are secure and confidential

Samples in 1 day, $50-200 fee refunded on 100+ units
Get a Quote in 30 Minutes
All uploads are secure and confidential.